General Information | ||||
Number of wards | 90 | |||
Area in Sq Km (Varanasi nagar Nigam) | 79 | |||
Population (In Lakh) | Year 2011 | | 11.98 | |
Year 2019 | Projected | 15.27 | ||
Total capacity in mld Required (Currently) | 183.24 | |||
Total capacity in mld Available | 412 | |||
Operational | 242 | |||
Ready for | 120 | |||
Under | 50 | |||
Gap | Nil | |||
Description of STPs and Sewerage Line | Subtotal Detail | ||||||||
SN | | 1 | 2 | 3 | 4 | 5 | 6 | ||
Description | |||||||||
1 | Name of The | Deenapur -1 STP | Deenapur -2 | Ramanna | Goithahan STP (JNNURM) | Bhagwanpur STP | DLW STP | | |
STP | STP | ||||||||
2 | Districts/Project area name | District-1 | District-2 | District -3 | Trans Varuna | BHU | DLW Area | | |
3 | Number of Wards Covered | 42 | 27 | 5 | 16 | NA | 50 | 90 Wards of VNN & 50 staff colonies of DLW | |
4 | Capacity (in mld) | 80 | 140 | 50 | 120 | 10 | 12 | 412 | |
5 | STP designed for the year | Year 2010 | Year 2030 | Year 2035 | Year 2030 | Year 2010 | Year 2010 | | |
6 | Current inflow in mld | 80 | 60 | under | Commissioned but | 10 | 5 | 155 | |
7 | SPS/MPS details (Name & Capacity) | | 1. SPS Phulwariya (7.6 MLD | 1. MPS Ramanna (50.00 MLD | 1. IPS Narokhar (8.00 MLD 2. MPS Goithahan (120.00 MLD Capacity) | | | | |
Sewerage Line Infrastructure Details |
| ||||||||
8 | Total Sewer Laying Length (in Km) required for full HH | 515 | 564 | 169 | 298 | NA | 50 | 1,596 | |
9 | Total Sewer Line Infrastructure available (in Km) | 264 | 292 | 57 | 142 | NA | 50 | 805 | |
A) | Sewer line | 264 | 281 | 51 | NA | NA | 50 | 646 | |
B) | Sewer line laid under various | 0 | 11 | 6 | 142 | 0 | 0 | 159 | |
10 | Sewer line sanctioned (in Km) in | 0 | 11 | 6 | 142 | 0 | 0 | 159 | |
C | Sewer line laying | 0 | 11 | 6 | 142 | 0 | 0 | 159 | |
D | Sewer line laying | 0 | 0 | 0 | 0.5 | 0 | 0 | 1 | |
11 | Gap in Sewerage Line Infrastructure (in Km) (8-9) | 251 | 272 | 112 | 155.5 | NA | NA | 791 | |
12 | Available Sewerage Line | 0 | 0 | 0 | 142 | NA | NA | 142 | |
| House Hold sewerage Connection Details |
| |||||||
| Total No of House Hold Connection | 254,000 | |||||||
13 | Number of total House Holds connection required under | 46,419 | 79,836 | 17,381 | 46,571 | NA | NA | 190,207 | |
14 | Number of Existing House Hold Connections as per ULB | 37,615 | 40,769 | 2,739 | 9,054 | NA | NA | 90,177 | |
15 | Number HH Covered under sanctioned Projects (AMRUT) | 0 | 0 | 0 | 22,973 | NA | NA | 22,973 | |
16 | GAP in House Hold Connection | 8,804 | 39,067 | 14,642 | 14,544 | NA | NA | 77,057 | |
| Gap Paln For Varanasi Sewerage Projects –Prposals |
| |||||||
| 1. DPR of District 1 | Proposed Cost : INR 542.13 Cr. |
| ||||||
| 2. DPR of District 2 | Proposed Cost : INR 633. Cr. |
| ||||||
| 3. DPR of District 3 (Proposed) | Proposed Cost: INR 252.89 Cr. |
| ||||||
| 4. DPR submitted (Trans Varuna) | Proposed cost: 142.34 cr. |
| ||||||
| 5. DPR under Preparation (Trans Varuna -Sewerage network in Sarnath | Proposed cost: NA (under preparation) |
| ||||||