Sewerage Profile _Kannauj | ||||||
General Information | ||||||
Number of wards | 25 | |||||
Area in Sq Km (Kannauj Nagar Palika Prishad) | 15 sqKm | |||||
Population (In Lakh) | Year 2011 | 84862 | ||||
Year 2019 | Projected | 152752 | ||||
Total capacity in mld Required (Currently) | 13 MLD | |||||
Total capacity in mld Available | ||||||
Operational | 13 MLD | |||||
Ready for operation | 13 MLD | |||||
Under Construction | 0 MLD | |||||
Gap | Nil | |||||
Description of STPs and Sewerage Line | ||||||
SN | Description | |||||
1 | Name of The STP | Jalalpur Amra STP Plant, Kannauj | ||||
2 | Districts/Project area name | Nagar Palika Parishad, Kannauj | ||||
3 | Number of Wards Covered | 25 Nos. | ||||
4 | Capacity (in mld) | 13 | ||||
5 | STP designed for the year | Year -2040 | ||||
6 | Current inflow in mld | 13 MLD | ||||
7 | SPS/MPS details (Name & Capacity) | 1. Ajay Pal MPS – 12 MLD 2. Ludhpuri IPS – 4.5 MLD | ||||
Sewerage Line Infrastructure Details | ||||||
8 | Total Sewer Laying Length (in Km) required for full HH coverage of the STP project area (Main trunk line, and branch line) | 102 | ||||
9 | Total Sewer Line Infrastructure available (in Km) (A+B) | 61.26 | ||||
A) | Sewer line already available | 0 | ||||
B) | Sewer line laid under various STP projects | 62.26 | ||||
10 | Sewer line sanctioned (in Km) in various STP projects (C+D) | 0 | ||||
C | Sewer line laying work completed ( in km) in various STP projects against sanctioned | 0 | ||||
D | Sewer line laying work ( in Km) under construction in various STP projects against sanctioned | 0 | ||||
11 | Gap in Sewerage Line Infrastructure (in Km) (8-9) | 40.74 | ||||
12 | Available Sewerage Line infrastructure non functional/non operation | 26.26 | ||||
House Hold sewerage Connection Details | ||||||
Total No of House Hold Connection Required (as per population projection for 2019)-16,700 | ||||||
13 | Number of total House Holds connection required under STP coverage area | 16,700 | ||||
14 | Number of Existing House Hold Connections as per ULB record | 3,200 | ||||
15 | Number HH Covered under sanctioned Projects (AMRUT) | 0 | ||||
16 | GAP in House Hold Connection Coverage (13-(14+15)) | 13,500 |