Sewerage Profile _ Garhmukteswar Sewerage Scheme | ||||||
General Information | ||||||
Number of wards | 25 | |||||
Area in Sq Km (Garhmukteswar) | 32.0 km2 | |||||
Population (In Lakh) | Year 2011 | As per census | 46077 | |||
Year 2019 | Projected | 54408 | ||||
Total capacity in mld Required (Currently) | Garh Zone – 6.0 MLD and Brijghat Zone – 3.0 MLD | |||||
Total capacity in mld Available | Garh Zone – 3.0 MLD and Brijghat Zone – 0.70 MLD | |||||
Operational | 09 MLD | |||||
Ready for operation | ||||||
Under Construction | ||||||
Gap | Nil | |||||
Description of STPs and Sewerage Line | Subtotal Detail | |||||
SN | 1 | 2 | ||||
Description | ||||||
1 | Name of The STP | Garh Zone | Brijghat Zone | |||
2 | Districts/Project area name | Garhmukteshwar, Dist: Hapur | Garhmukteshwar, Dist: Hapur | |||
3 | Number of Wards Covered | 23 | 2 | |||
4 | Capacity (in mld) | 6 | 3 | 9 | ||
5 | STP designed for the year | Year 2024 | Year 2024 | |||
6 | Current inflow in mld | 2.5 | 0.51 | |||
7 | SPS/MPS details (Name & Capacity) | 1. MPS – 7.5 MLD | 1. MPS – 3.0 MLD | |||
Sewerage Line Infrastructure Details | ||||||
8 | Total Sewer Laying Length (in Km) required for full HH coverage of the STP project area (Main trunk line, and branch line) | 63 | 12 | 75 | ||
9 | Total Sewer Line Infrastructure available (in Km) (A+B) | 53 | 12 | 65 | ||
A) | Sewer line already available | 0 | 0 | 0 | ||
B) | Sewer line laid under various STP projects | 53 | 12 | 65 | ||
10 | Sewer line sanctioned (in Km) in various STP projects (C+D) | 53 | 12 | 65 | ||
C | Sewer line laying work completed ( in km) in various STP projects against sanctioned | 53 | 12 | 65 | ||
D | Sewer line laying work ( in Km) under construction in various STP projects against sanctioned | 0 | 0 | 0 | ||
11 | Gap in Sewerage Line Infrastructure (in Km) (8-9) | 10 | 0 | 10 | ||
12 | Available Sewerage Line infrastructure non functional/non operation | 0 | 0 | 0 | ||
House Hold sewerage Connection Details | ||||||
Total No of House Hold Connection Required (as per population projection for 2019) | ||||||
13 | Number of total House Holds connection required under STP coverage area | 7,880 | 900 | 8,780 | ||
14 | Number of Existing House Hold Connections as per ULB record | 0 | 0 | 0 | ||
15 | Number HH Covered under sanctioned Projects (State Sector) | 7880 | 900 | 8,780 | ||
16 | GAP in House Hold Connection Coverage (13-(14+15)) | 0 | 0 | 0 |