Sewerage Profile _ Narora Sewerage Scheme | ||||||
General Information | ||||||
Number of wards | 18 | |||||
Area in Sq Km (Narora) | 18 km2 | |||||
Population (In Lakh) | Year 2011 | As per census | 24457 | |||
Year 2019 | Projected | 28895 | ||||
Total capacity in mld Required (Currently) | 4.0 MLD | |||||
Total capacity in mld Available | ||||||
Operational | ||||||
Ready for operation | 4.0 MLD | |||||
Under Construction | ||||||
Gap | Nil | |||||
Description of STPs and Sewerage Line | Subtotal Detail | |||||
SN | 1 | 2 | 3 | |||
Description | ||||||
1 | Name of The STP | Nraora | ||||
2 | Districts/Project area name | Narora, District-Buland Shahar
| ||||
3 | Number of Wards Covered | 11 | ||||
4 | Capacity (in mld) | 4.00 | 4.00 | |||
5 | STP designed for the year | Year 2033 | ||||
6 | Current inflow in mld | 0 | ||||
7 | SPS/MPS details (Name & Capacity) | 1. MPS – 5.25 MLD | ||||
Sewerage Line Infrastructure Details | ||||||
8 | Total Sewer Laying Length (in Km) required for full HH coverage of the STP project area (Main trunk line, and branch line) | 36 | 36.00 | |||
9 | Total Sewer Line Infrastructure available (in Km) (A+B) | 24 | 24 | |||
A) | Sewer line already available | 0 | 0.00 | |||
B) | Sewer line laid under various STP projects | 24 | 24 | |||
10 | Sewer line sanctioned (in Km) in various STP projects (C+D) | 24 | 24 | |||
C | Sewer line laying work completed ( in km) in various STP projects against sanctioned | 24 | 24 | |||
D | Sewer line laying work ( in Km) under construction in various STP projects against sanctioned | 0 | 0 | |||
11 | Gap in Sewerage Line Infrastructure (in Km) (8-9) | 12 | 12 | |||
12 | Available Sewerage Line infrastructure non functional/non operation | 12 | 12 | |||
House Hold sewerage Connection Details | ||||||
Total No of House Hold Connection Required (as per population projection for 2019)- | ||||||
13 | Number of total House Holds connection required under STP coverage area | 5,565 | 5,565 | |||
14 | Number of Existing House Hold Connections as per ULB record | 0 | 0 | |||
15 | Number HH Covered under sanctioned Projects (State sector) | 5565 | 5,565 | |||
16 | GAP in House Hold Connection Coverage (13-(14+15)) | 0 | 0 |